Romania has become one of the most active solar markets in Central and Eastern Europe. Record installations, state-backed contracts for difference and a growing number of ready-to-build projects have attracted developers, utilities and private investors. The same growth has also produced speculative permits and projects that will never be built. This checklist explains what to verify before you buy a solar park or another energy project in Romania, and where the real value sits.
The market in numbers
- Romania added 2.2 GW of solar capacity in 2025, a third consecutive record year, taking the cumulative total above 7 GW, according to the Romanian Photovoltaic Industry Association (RPIA).
- Utility-scale installations almost doubled, from 613 MW in 2024 to about 1.2 GW in 2025.
- Growth continued in 2026: around 1.8 GW was added in the first six months, bringing installed solar capacity above 8.5 GW.
- Two contracts for difference (CfD) auctions, in 2024 and August 2025, awarded a combined 4.2 GW of solar and wind capacity, above the 3.5 GW target in Romania's Recovery and Resilience Plan. In the second round, solar bids went as low as about €35/MWh, under 15-year contracts.
For investors, the message is clear: there is demand, financing and a support scheme, but competition is strong and prices are tight. A project is only worth what its permits, grid connection and revenue contract allow it to produce.
Ready-to-build project or operating plant?
The first decision is the stage at which you enter. An operating plant has a production history and lower execution risk, while a ready-to-build (RTB) project offers more upside but depends on construction, grid works and timing. The trade-offs are explained in detail in this analysis of solar park investment in Romania: RTB project or operating plant. Projects currently on the market are grouped under energy projects and solar parks for sale in Romania.
Due diligence checklist
1. Grid connection permit (ATR)
The technical grid connection permit (aviz tehnic de racordare, ATR) is the most valuable document in a Romanian energy project, and the rules around it have become much stricter:
- For projects above 1 MW, the regulator ANRE raised the financial guarantee needed to obtain an ATR from 5% to 20% of the connection fee, to discourage speculative applications.
- Developers must obtain the setting-up authorisation within 12 months of signing the connection contract and no later than 18 months from the ATR. If they miss the deadline, the ATR lapses and the connection agreement is terminated.
- From 2026, new grid capacity is allocated through auctions run by the transmission operator Transelectrica, and bidders must post a guarantee of €20,000 per MW requested.
Check the ATR date, the deadlines already running, the guarantees in place and whether the connection solution requires grid reinforcement works.
2. Land rights and zoning
Verify ownership or long-term rights (lease or superficies) over every plot, the land book entries, and whether the land has been rezoned for energy use. For larger sites, the urban plans decide what can be built: see the guide on reading PUZ and PUG before investing in land. If you are looking for a site rather than a project, review the land for development projects in Romania.
3. Permits and environmental approvals
Check the urbanism certificate, the environmental decision, the building permit and its validity, and any archaeological or agricultural land conversion approvals.
4. Revenue: CfD, PPA or merchant
Under a CfD, if market prices fall below the agreed strike price the producer receives the difference from the state, and if prices are higher the producer pays the difference back. Confirm whether the project holds a signed CfD, a corporate PPA or neither, and model the merchant risk accordingly.
5. Technical review
For operating plants, ask for production data, availability, inverter and module warranties, O&M contracts and curtailment history. For RTB projects, ask for the yield study and the EPC budget.
6. Corporate structure
Energy projects are normally held in a project company. Review its accounts, debts, guarantees and contracts. If you need a new vehicle, you can register a project company in Romania before closing.
Beyond solar
Other energy and infrastructure assets follow the same logic of power, land and permits. Small hydropower plants have their own water-use and environmental issues, covered in what to check before buying a small hydropower plant in Romania. Data centers depend on secured power capacity and the right land, as explained in data center investment in Romania: power, land and permits.
Frequently asked questions
Can a foreign investor buy a solar park in Romania?
Yes. Most transactions are share deals: the investor buys the project company that holds the permits, land rights and contracts. The structure should be checked by local legal and tax advisors.
What is the biggest risk in buying an RTB project?
Usually the grid connection: an ATR close to expiry, unpaid guarantees or expensive reinforcement works can wipe out the value of an otherwise good project.
To review a specific project or to receive off-market opportunities, see the current investment opportunities in Romania or speak directly with an energy and real estate investment advisor in Romania.
This article is general information and not investment, legal or technical advice. Regulations in the Romanian energy sector change often, so verify current rules before any commitment.
Sources
- pv magazine – Romania installs 2.2 GW of solar in 2025
- pv magazine – Romania proceeds with first grid capacity auction
- EBRD – Romania delivers second successful renewable energy auction
- pv magazine – Romania awards 1.4 GW of solar in second auction
- pv magazine – Romania tightens grid connection rules
- CMS – Romania tightens electricity grid access and licensing